#: locale=en
## Media
### Title
panorama_D66FD41C_DA11_97D3_41D5_7F0B28361583.label = Image 1
panorama_D1EDBA21_DA16_F3F5_41E9_260FE4A3A88F.label = Image 2
## Popup
### Body
htmlText_C813EA05_DA32_93BD_41E3_4F317DF4A3AB.html =
Identify Hazards
Refer to 8.1
Identify when hazardous material or energy sources require isolation and determine if an isolation permit is needed.
htmlText_C8D1B976_DA37_905F_41EA_7A4D5CEC7C63.html = Remote Switching
Refer to 4.C & 4.3
Remote switching of HV equipment is installed so it allows operation at a safe distance and remove the risk of arc flash hazards to operators when switching.
htmlText_C87A8721_DA1F_91F5_41CB_29AA3EC8B579.html = Checks & Inspections
Refer to 4.B , 4.4 & 8D
Distribution boards(DB) and Residual Current Devices RCD checked as required in AS3012 (Electrical installations in construction and demolition sites)
Continually monitor isolation controls to ensure they are in place and working as intended.
htmlText_CB3A97B1_DA11_B0D4_41D0_9D4C87DA1EE5.html = Critical Controls
Refer to 4.A & 4.D
Construction of switchboard should be arc-fault contained to limit risk of arc flash, switch board form factor 3 or 4. PPE requirement signage.
htmlText_CB0B6364_DA12_907C_41E6_0D9FD165EC4D.html = Hot stick
Refer to 8.A
Modiewok used to prove that equipment is de-energised, it needs to be within calibration date.
htmlText_C783D43D_DA86_81F9_41E9_60305C3222BF.html = Identification
Refer to 8.4
Clearly labelled switchboard isolators.
htmlText_C6919B2B_DA82_8799_41E6_7CF64E2FDC7C.html = Isolation Points
Refer to 8.1 & 8.4
Isolation point for the electrical circuit, controlled by the switchboard module.
htmlText_C7D89CFD_DA83_8279_41CE_D649A0639799.html = LV Rescue Kit
LV rescue kit and appropriate fire extinguisher available for emergency preparedness.
htmlText_CA0F1E9C_DA16_90D3_41BE_8A1FEAF10B77.html = Lock Box
Refer to 8.F
Lock Box used as part of isolation procedure to store isolation keys to prevent unauthorised isolation.
htmlText_CAE016EE_DA12_B04F_4199_FBC3B19C2C86.html = Schematics
Refer to 8.2
UP TO DATE SCHEMATICS TO IDENTIFY ISOLATION POINTS
## Tour
### Description
### Title
tour.name = GMR 8 Isolation