htmlText_CC58FDCB_D5EB_1860_41D5_3F695DE4ACF6.html =
Bracing to secure the scaffold, as per the temporary work design.
htmlText_CCE93A9A_D5E9_18E0_41E9_9C77AEB88239.html = Check the scaffold tag before accessing to ensure the date is current and the structure is safe for use. Working load limits for temporary works must be displayed or communicated to all personnel likely to use the temporary works.
htmlText_CCCC1903_D5E8_F9E7_41DA_82B072349242.html = Concrete barriers protecting the temporary works from accidental impact.
htmlText_CCCAC514_D5D9_09E1_41C7_00E6CA53EF03.html = Edge protection including top rail (900-1100mm), mid rail, kickboard and mesh.
htmlText_CFB3602E_D5F7_0820_41BE_1352E0539399.html = Install and remove temporary works in accordance with the approved methodology and design documentation.
htmlText_CC1D6864_D5E9_3820_41E5_22F332F173C0.html = Obtain approval from the Temporary Works Coordinator before carrying out any alterations.
htmlText_CC2084D9_D5D7_0860_41DD_9C12ADF883F3.html = Shade cloth to prevent any material or debris from escaping.
htmlText_CCD54DBD_D5E9_1823_41E1_5EA2F136200C.html = Temporary work regularly monitored and inspected, with a specific inspection schedule, to ensure it remains fit for purpose throughout its Design Life, with any adverse signs of distress, damage, or unapproved alterations identified and addressed to prevent risk of failure.
htmlText_CCD76E31_D5E9_1820_41C4_B47C59540306.html = Temporary works must be planned, assessed and approved by a competent person.