Refer to 3.1
All lifting operations must be planned, managed and conducted by a competent person(s).
htmlText_CD2978D1_DA87_8288_41E8_52E5177279DE.html = Refer to 3.2
Nominate the role of a Lift Designer for both pre-contracts and delivery phases
htmlText_C28C5965_DA83_8389_41D2_5CC6CBA17BF9.html = Refer to 3.3
Ground bearing capacities must be assessed.
htmlText_CD7E191B_DA82_83B9_41D2_4ED7B74CFD04.html = Refer to 3.D
Do not place yourself underneath a suspended load or in the line of fire of lifting operations
htmlText_C2F92C6A_DA9E_819B_41D3_29AC1D1C31C6.html = Refer to GMR 3.6
Conduct a site inspection to visually confirm there are no fundamental changes or additional hazards posing a risk to the lift
htmlText_CD27C92A_DA83_839B_41B4_EEB652FC7D35.html = Refer to GMR-3.C
Do not enter an exclusion zone unless authorised.